Treat a large portfolio as individual installation scopes
A Texas rollout should include a separate door count, current-system inventory and onsite contact for each property. Shared identity and reporting requirements can be designed together while local work windows, network readiness and acceptance checks remain explicit.
Prepare your installation brief
- Create an address-by-address door and hardware schedule
- Define shared identity and reporting requirements
- Confirm local readiness, work windows and acceptance
Installation, migration and software configuration
Our team reviews the door hardware, controllers, readers, credentials, cabling and network as one installation scope. For an existing system, the assessment separates confirmed hardware reuse from items needing inspection or replacement. The proposal can include commissioning, administrator training and the handover documents for each location.
